Period Underwear Reorder Checklist for Wholesale Buyers

For a repeat wholesale period underwear order, confirm the approved product revision before asking for the same style again. Reconcile size and color demand, identify any material or construction changes, and agree which samples and checks are required before production. A previous delivery is a reference, not automatic approval for a changed product.

What should a period underwear reorder include?

Send the previous purchase order reference, your own product identifier, approved specification revision, quantities by size and color, requested arrival date and destination. Ask the manufacturer to identify changes and unresolved details in writing. Keep commercial terms and production approval separate: accepting a quotation should not silently approve a material substitution.

1. Build a reorder allocation from usable demand

Record units sold, days actually available for sale, remaining sellable inventory and confirmed incoming stock for each size and color. Note returns and fit feedback separately. Low sales during a stockout do not demonstrate low demand, and a launch promotion may not represent normal demand.

A practical planning calculation is expected demand during the confirmed replenishment period, plus your chosen buffer, minus sellable stock and confirmed incoming units available in time. Treat the result as a planning estimate. Review it against minimums, pack multiples and your budget before placing the order.

Hypothetical example: A buyer expects demand of 120 units during replenishment, chooses a 30-unit buffer, has 40 sellable units and has 20 confirmed incoming units arriving in time. The preliminary requirement is 120 + 30 − 40 − 20 = 90 units. This is not a Linglu minimum or a demand forecast. Calculate the size-and-color breakdown before rounding to an order quantity, and avoid counting uncertain incoming stock as available.

Separate return reasons before changing the next order

Before reducing a size or changing construction, connect each complaint to the buyer product reference, size, color, production lot and units sold. Record the customer’s description separately from your assessment. One complaint can have several possible causes; a reported leak alone does not establish a manufacturing defect.

  • Fit or size expectation: record the size purchased, the size chart shown at purchase and the reported fit issue. Check returned garments against the approved measurement method before revising grading.
  • Construction concern: record the affected location, photographs where appropriate and the lot reference. Keep suspect stock on hold while the issue is assessed.
  • Performance expectation: retain the product description and care instructions supplied with that lot. Review the stated use conditions and relevant verification; do not infer a tested capacity from the complaint.
  • Wrong item or packing: compare the order, garment label, barcode and carton allocation before requesting a product redesign.

Use comparable denominators: count affected units rather than support messages, and compare units from the same observation period. A customer may contact support more than once. Mark uncertain causes as unresolved and agree the next check, owner and deadline. Feed confirmed findings into the reorder specification; keep open investigations visible instead of treating them as approved changes.

2. Ask for a change declaration

Repeat-order confirmation checklist
Item Written confirmation to request
Body fabric Composition, fabric specification, color reference and whether the production-intended material differs from the approved revision.
Functional gusset Layer sequence, dimensions, placement, barrier construction and any proposed material or assembly change.
Fit and grading Measurement chart, measurement method, tolerances, size labels and any pattern revision.
Branding and packaging Artwork revision, label text, barcode mapping, individual packs and carton assortment.
Evidence Current documentation for the exact product and proposed claims; required testing and inspection scope.
Commercial terms Quantity minimums, quote validity, currency, named delivery point, inclusions and confirmed schedule.

Ask for an explicit “unchanged” or a described difference for each relevant field. An unanswered field remains pending. A material that looks similar should not be assumed to have the same stretch, washing behavior or functional performance.

3. Match approval checks to the proposed change

If the specification is unchanged, agree how the new production lot will be compared with the retained reference sample and which routine checks apply. If fabric, gusset layers, pattern, assembly or care instructions change, review the affected characteristics before approval. Ask the responsible testing or inspection provider to define suitable verification rather than assuming an old report covers the revision.

  • New color: confirm the color reference, label mapping and any material or process differences requiring review.
  • New size: confirm grading, measurements and protective coverage for the added size rather than extending a label alone.
  • Changed gusset: review construction and relevant functional verification before production release.
  • New packaging: approve artwork, product identification and packing allocation; clarify ownership and storage of unused printed materials.

Use the sample acceptance checklist to document the scope of approval. An approved fit sample does not by itself approve a new functional construction.

4. Keep a simple change-control record

Give every proposed change a reference, date, reason, affected product revision and decision owner. Record expected effects on price, minimums, schedule, labeling and testing. Mark the decision as approved, rejected or pending. Attach the agreed revised specification and archive the earlier version so production does not mix instructions.

Hypothetical example: The buyer wants the same mid-rise brief in an additional size, while the supplier proposes a different body fabric. These are two separate changes. Approval of the size extension should not automatically approve the fabric change. Close both decisions and the relevant sample checks before releasing the revised order.

5. Confirm the replenishment schedule and shipment release

Work backward from the required warehouse arrival date. Obtain project-specific confirmation for material readiness, sample review if needed, production, inspection, dispatch and freight. State who must approve each stage and when. Do not substitute the previous order’s lead time for a current commitment.

Before shipment, reconcile quantities and packing against the current order. Use the bulk inspection checklist to record actual lot checks, corrective actions and the authorized release decision. Keep returned or held stock separate from sellable stock in the next reorder calculation.

Copy this repeat-order request

We are preparing a repeat order for [our product reference], previously supplied under [purchase order]. Please quote [quantity allocation by size/color] against approved specification [revision]. Our required arrival date and destination are [details]. Confirm whether materials, gusset, pattern, sizing, labels or packing have changed. List proposed differences separately, including their effects on cost, minimums, samples, testing and schedule. Please do not substitute materials or construction without written approval. Confirm the inspection and shipment-release arrangements for this lot.

Replace the bracketed fields with your own details. Do not include private customer information unless it is necessary for the order.

Discuss your next period underwear order with Linglu

Browse our period underwear styles and private label manufacturing service. Contact Linglu on WhatsApp with your target market, quantity, preferred styles and customization needs. For a reorder, also provide your previous order reference and approved revision. Availability, pricing, minimums and timing require confirmation for the current project.

Product Enquiry